Sign In | Join Free | My himfr.com
Home > Steel Box Girder Bridge >

Q460 Steel Structural Bridge Segmental Steel Box Girder Bridge Fast Delivery

Hangzhou USEU Metal Manufacturing Company
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Q460 Steel Structural Bridge Segmental Steel Box Girder Bridge Fast Delivery from wholesalers
     
    Buy cheap Q460 Steel Structural Bridge Segmental Steel Box Girder Bridge Fast Delivery from wholesalers
    • Buy cheap Q460 Steel Structural Bridge Segmental Steel Box Girder Bridge Fast Delivery from wholesalers
    • Buy cheap Q460 Steel Structural Bridge Segmental Steel Box Girder Bridge Fast Delivery from wholesalers

    Q460 Steel Structural Bridge Segmental Steel Box Girder Bridge Fast Delivery

    Ask Lasest Price
    Brand Name : FMS
    Model Number : FMS200
    Certification : ISO9001
    Price : USD1000~USD1200 per ton
    Payment Terms : L/C, T/T, D/A, D/P, Western Union
    Supply Ability : 10000 units per year
    Delivery Time : 60 to 90 days
    • Product Details
    • Company Profile

    Q460 Steel Structural Bridge Segmental Steel Box Girder Bridge Fast Delivery

    Q460 Steel Structural Bridge Segmental Steel Box Girder Bridge Fast Delivery

    Description

    Steel Box Girder Bridge refers to a beam bridge whose main beam is in the form of a thin-wall closed section. Long hollow trusses made of steel or concrete are usually used as beams. This makes the bridge light and sturdy. Bridges constructed using this method are called Steel Box Girder Bridge.


    Steel box girder bridges are commonly used for highway flyovers and for modern elevated structures of light rail transport. Although normally the steel box girder bridge is a form of beam bridge, box girders may also be used on cable-stayed bridges and other forms.


    Q460 Steel Structural Bridge Segmental Steel Box Girder Bridge Fast Delivery

    Application

    Generally used for urban bridges or highway viaducts and overpasses

    · Road Bridges

    · Pedestrian Bridges

    · Railway Bridges

    · Highway Bridges


    Construction
    For steel box girders, the girders are normally fabricated off site and lifted into place by crane, with sections connected by bolting or welding. If a composite concrete bridge deck is used, it is often cast in-place using temporary falsework supported by the steel girder.

    Either form of bridge may also be installed using the technique of incremental launching. Under this method, gantry cranes are often used to place new segments onto the completed portions of the bridge until the bridge superstructure is completed.


    Features
    Pre-engineered, pre-fabricated bridge system
    Highly adaptable, fully reusable and re-locatable
    Transported in standard ISO containers
    Quick and simple to build using labour
    Fully galvanized for long life and minimum maintenance
    Proprietary steel decking systems to suit different loading requirements
    Durbar finish or factory applied anti-skid surfacing
    Full highway load carrying capability
    Simple, cost effective foundations


    Our company

    Our highly trained engineering and production team focus on your steel bridge project's success, from start to finish. Our proven ability to identify and overcome design inconsistencies, potential problems with erection, and shipping obstacles results in the fabrication of structural steel that is right the first time, helping you avoid costly construction delays.

    Quality Q460 Steel Structural Bridge Segmental Steel Box Girder Bridge Fast Delivery for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Hangzhou USEU Metal Manufacturing Company
    *Subject:
    *Message:
    Characters Remaining: (0/3000)