Sign In | Join Free | My himfr.com
Home > Prefabricated Pedestrian Bridges >

7.3m Width Pre Engineered Pedestrian Bridges Business Center Solve Congested Traffic

Hangzhou USEU Metal Manufacturing Company
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap 7.3m Width Pre Engineered Pedestrian Bridges Business Center Solve Congested Traffic from wholesalers
     
    Buy cheap 7.3m Width Pre Engineered Pedestrian Bridges Business Center Solve Congested Traffic from wholesalers
    • Buy cheap 7.3m Width Pre Engineered Pedestrian Bridges Business Center Solve Congested Traffic from wholesalers
    • Buy cheap 7.3m Width Pre Engineered Pedestrian Bridges Business Center Solve Congested Traffic from wholesalers
    • Buy cheap 7.3m Width Pre Engineered Pedestrian Bridges Business Center Solve Congested Traffic from wholesalers

    7.3m Width Pre Engineered Pedestrian Bridges Business Center Solve Congested Traffic

    Ask Lasest Price
    Brand Name : FAMOUS
    Model Number : CB100(321-Type)&HD200
    Certification : ISO9001
    Price : USD1000~USD1200 per ton
    Payment Terms : L/C, T/T, D/A, D/P, Western Union
    Supply Ability : 10000 units per year
    Delivery Time : 30 days
    • Product Details
    • Company Profile

    7.3m Width Pre Engineered Pedestrian Bridges Business Center Solve Congested Traffic

    7.3m Width Steel Structure Prefabricated Pedestrian Bridges In Business Center To Solve Congested traffic

    Description

    Provision of suitable access for wheelchairs and cyclists is often specified for pedestrian bridges. Access ramps must be provided and restricted to a maximum gradient. The consequent length of ramps where access is from the level of the road or rail track over which the bridge spans is generally much longer than the bridge itself. The form of construction suitable for the ramps may have a dominant influence on the final form of the bridge.


    Specification

    Product NamePrefabricated Pedestrian Bridges
    Width7.3meter
    Maximum span64meter single span and 200meter multi span
    Bridge deckSteel composit panel
    Steel gradeQ345B (equivalent to ASTM A572)
    Loading capacity20ton, 40ton truck etc, or HS20-44, HS25-44/Truck 20
    CorrosionOriginal painted or Hot dip galvanized
    AdvantagesPrice effective and technical full analysis and supports

    History
    First bridges in history were pedestrian bridges and they were made of wood. Ancient Rome started making stone bridges in the 2nd century BC over the Tiber River. Some of these ancient stone footbridges with arches still stand today. One of them is Ponte Fabricio which was built in 62 BC and it still has some of its original materials. Today, modern footbridges are made of wood, rope, metal and concrete.


    Design
    Design of pedestrian bridge normally follows the same principles as for other bridges. However, because they are normally significantly lighter than vehicular bridges, they are more vulnerable to vibration and therefore dynamics effects are often given more attention in design.
    To ensure pedestrian bridges are accessible to disabled and other mobility-impaired people, careful consideration is nowadays also given to provision of access lifts or ramps, as required by relevant legislation.


    Features
    The width of a pedestrian bridge is usually quite modest, just sufficient to permit free passage in both directions for pedestrians. Occasionally the bridge will have segregated provision for pedestrians and cyclists, in which case it will need to be wider. Parapets are provided for the safety of both the pedestrians and traffic flow. Pedestrian bridgeS over railway lines are required to have higher parapets and be provided with solid panels directly over the rail tracks.


    Type
    Beam Bridge
    Boardwalk
    Clapper bridge
    Duckboards, Timber track way, Plank road, and Corduroy road
    Moon bridge
    Simple suspension bridge
    Simple truss
    Stepping stones
    Zigzag bridge


    Characteristics
    1.Environmental protection
    2.Higher reliability of steel work
    3.Strong quake proof
    4.Higher degree of industrialization
    5.Quick to be assembled accurately
    6.Larger interior space



    Our company

    Our experienced team is focused on your steel bridge project's success, from start to finish. Our proven ability to identify and overcome design inconsistencies, potential problems with erection, and shipping obstacles results in the fabrication of structural steel that is right the first time, helping you avoid costly construction delays.


    Proper project coordination and efficient delivery of the structural steel to your bridge project is a key factor in its ultimate success. This is what gives us the leading edge.


    From material purchase and tracing, planning compilation, drawing detailing, production arrangement, quality inspection, to on-going painting, packing and delivering, we have separated department to strictly control process, quality and traceability, so that the perfect Bailey/Belay/Baley Bridge can be made.


    Finally we would like to emphasize that not like other companies, nearly all machining parts and mechanical accessories are manufactured in our own shop as we have so many wonderful machines and workers inside. In this way, the quality, cost and delivery time can be ensured which eliminates other exterior factors’ influence.

    Warmly welcome all friends and clients from International market to visit us!

    Quality 7.3m Width Pre Engineered Pedestrian Bridges Business Center Solve Congested Traffic for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Hangzhou USEU Metal Manufacturing Company
    *Subject:
    *Message:
    Characters Remaining: (0/3000)