Sign In | Join Free | My himfr.com
Home > Bailey Bridge Panel >

Blue Steel Bridge Components Steel Structure Acrossing River Q345B - Q460C Grade

Hangzhou USEU Metal Manufacturing Company
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Blue Steel Bridge Components Steel Structure Acrossing River Q345B - Q460C Grade from wholesalers
     
    Buy cheap Blue Steel Bridge Components Steel Structure Acrossing River Q345B - Q460C Grade from wholesalers
    • Buy cheap Blue Steel Bridge Components Steel Structure Acrossing River Q345B - Q460C Grade from wholesalers
    • Buy cheap Blue Steel Bridge Components Steel Structure Acrossing River Q345B - Q460C Grade from wholesalers
    • Buy cheap Blue Steel Bridge Components Steel Structure Acrossing River Q345B - Q460C Grade from wholesalers

    Blue Steel Bridge Components Steel Structure Acrossing River Q345B - Q460C Grade

    Ask Lasest Price
    Brand Name : FAMOUS
    Model Number : CB100(321-Type)
    Certification : ISO9001
    Price : USD1000~USD1200 per ton
    Payment Terms : L/C, T/T, D/A, D/P, Western Union
    Supply Ability : 10000 units per year
    Delivery Time : 30 days
    • Product Details
    • Company Profile

    Blue Steel Bridge Components Steel Structure Acrossing River Q345B - Q460C Grade

    Port Transporter Bridge Steel Structure Modular Panel Transporter Bridge Acrossing River


    Description

    Bailey bridge is standard bridge equipment, adopted extensively and the most popular in the world, possessing the features of simple structure, convenient transport, speedy erection and easy disassembling. While having the advantage of heavy loading capacity, great stability and long fatigue life being capable of an alternative span, long capacity and mixture form to erect all kinds and usage of temporary bridges, emergency bridges and fixed bridges. The bridge has the advantages of few components, light weight and low cost.


    Specification

    Product NameSpecification of Compact 100 &200 Bailey bridge
    Width3.7meter
    Maximum span64meter single span and 200meter multi span
    Bridge deckSteel composit panel
    Steel gradeQ345B
    Loading capacity20ton, 40ton truck etc, or HS20-44, HS25-44/Truck 20
    CorrosionHot galvanized
    AdvantagesPrice effective and technical full analysis and supports

    Bailey bridge panel consists of pannels,pins, post end, ,bolt, chord reinforcement ,truss bolt and chord bolt.
    Comprising upper & lower chord member, montant and raker welded. One end of the upper & lower chord member is female, and the other end is male, both with pin hole.


    Features
    Modular, pre-engineered, pre-fabricated bridge system
    Standard interchangeable components
    Highly adaptable, fully reusable and re-locatable
    Transported in standard ISO containers
    Quick and simple to build using labour
    Fully galvanized for long life and minimum maintenance
    3.048m module length
    4.2m single lane
    Proprietary steel decking systems to suit different loading requirements
    Durbar finish or factory applied anti-skid surfacing
    Full highway load carrying capability
    Simple, cost effective foundations


    Application
    Spans from 3.6m to 31m and more - for highways, railways, pathways, bicycle racks, landscaping, etc
    Standardized designs - as per Indian BIS a. RC standards and codes
    Heavy live loads with high overfills - capable of supporting heavy freighter aircraft and mining haulers
    Smooth approaches - from earth embankments due to soil overfill, does not require any approach slab
    Low life cycle costs - traffic runs on overfill and not over an exposed bridge deck
    Aesthetic structures - the true arch form is accentuated.


    Materials and Finishes

    Domestic steel is used throughout. Most load-bearing components use low-alloy, high-tensile ASTM A242 steel with a yield point of 50,000 psi. Excellent corrosion resistance is achieved with an inorganic zinc silicate coating. Final color is lusterless light gray. Hot dipped galvanized is also available.


    Advantage

    Our experienced team is focused on your steel bridge project's success, from start to finish. Our proven ability to identify and overcome design inconsistencies, potential problems with erection, and shipping obstacles results in the fabrication of structural steel that is right the first time, helping you avoid costly construction delays.



    Proper project coordination and efficient delivery of the structural steel to your bridge project is a key factor in its ultimate success. This is what gives us the leading edge.


    From material purchase and tracing, planning compilation, drawing detailing, production arrangement, quality inspection, to on-going painting, packing and delivering, we have separated department to strictly control process, quality and traceability, so that the perfect Bailey/Belay/Baley Bridge can be made.


    Finally we would like to emphasize that not like other companies, nearly all machining parts and mechanical accessories are manufactured in our own shop as we have so many wonderful machines and workers inside. In this way, the quality, cost and delivery time can be ensured which eliminates other exterior factors’ influence.

    Warmly welcome all friends and clients from International market to visit us!

    Product Tags:

    bailey panel

      

    bailey bridge parts

      
    Quality Blue Steel Bridge Components Steel Structure Acrossing River Q345B - Q460C Grade for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Hangzhou USEU Metal Manufacturing Company
    *Subject:
    *Message:
    Characters Remaining: (0/3000)